On-Site Flange Facing For Deck Crane Pedestal Flange
Crane post flange surface renewal for bulk carrier in China
During a short, scheduled dry-docking at COSCO Guangzhou in China, the operator of the Capetan Vassilis, a 10-year-old bulk carrier, encountered unforeseen damage on one of the deck crane pedestal’s 2.75-meter diameter flanges.
The operator immediately approached Goltens to inspect the problem and work together with the shipyard to propose a repair solution for the crane. Goltens’ on-site machining specialist evaluated the condition and proposed a work schedule that met the time constraints of the docking.
A repair procedure was issued by Goltens and approved by the customer and class. As the dry docking schedule was short, Goltens modified its flange facing machinery and tooling to suit a vertical machining application before order confirmation. Upon confirmation, Goltens immediately dispatched its laser alignment equipment and machining tools and technicians to the shipyard in Guangzhou.
PROJECT FACTS
CAPETAN VASSILIS | |
---|---|
Customer: | Saint Michael Shipping Co., Ltd |
Vessel Type: | Bulk Carrier |
Tonnage: | 51,196 DWT |
Flange Diameter: | 2,755.00mm |
Machined Surface: | 120mm |
IN-PLACE FLANGE MACHINING CONSISTED OF
- Performed laser flatness checks on crane post flange number 2
- Performed vertical on-site flange facing machining 3.5mm from the crane pedestal flange surface
- Performed post-machining laser flatness checks confirming flatness within 0.15mm.
ON-SITE MACHINING RESULTS
Goltens technicians completed this job within 2 days to keep up with vessel’s short dry-dock schedule.
The result was excellent and was approved and accepted by the Crane OEM supervisor, the class surveyor and the shipyard QC officer.
Download a PDF of this Resource
(Right click and select "Save File As..." or "Save Link As..." to save)
Download Now