Bearing support surface renewal

As a result of the service delivered on a sister ship earlier in the year, Goltens received an enquiry from the shipowner to attend the 190 meter, 55,711 DWT bulk carrier in drydock to evaluate the condition and renew the bearing support surfaces for the ship’s Number 1 crane post.

Goltens deployed tools and technicians to the ship and carried out the laser checking and flange facing on the 2.8 meter diameter surfaces. With work completed to the owner’s satisfaction, Goltens was subsequently awarded the machining work for units 2, 3 and 4

  • Crane removed from bearing support

  • Installation of flange facer on 2.8m dia. Pedestal

  • Adjustment of the flange facer

PROJECT FACTS

M/V MIMI SELMER
Dimension: OD: 2820.00mm×W: 120mm
Number of surfaces: 4
Ship Length: 190 meter
Tonnage: 55,711 DWT

REPAIRS

  • Flatness checking with laser equipment on crane No.1, No.2, No.3 and No.4

RESULTS

Goltens technicians completed this job within 5 days with 2 shift teams to keep up with vessel’s dry-dock schedule.

Download a PDF of this Resource

(Right click and select "Save File As..." or "Save Link As..." to save)

Download Now
Dev Tool:

Request: resources/in-situ-flange-facing-for-a-crane-post
Matched Rewrite Rule: resources/([^/]+)(?:/([0-9]+))?/?$
Matched Rewrite Query: resources=in-situ-flange-facing-for-a-crane-post&page=
Loaded Template: single-resources.php
Search Goltens ×