Goltens won a tough public tender for the major inspection/overhaul of a gas turbine in Bangladesh. The combined cycle turbine plant, powered by a GE Frame 6B gas turbine and owned by the Bangladeshi government, delivers electricity to the national grid.

Goltens completed a pre-inspection of the 35.7MW gas turbine, as part of the tendering process, to asses and collect HDPI records, DCS data, availability of spare parts and special tools and identify any other potential issues.

  • GE Frame 6B combined cycle plant

    Fenchugonj Combined Cycle Plant

  • Removal of GE Frame 6 gas turbine casing

    Removal of Turbine casing

  • GE Frame 6 turbine casing removed

    Turbine casing removed

  • Dismantling GE Frame 6 turbine and accessories

    Dismantling turbine and accessories

  • Dismantling GE Frame 6 turbine and accessories

    Dismantling turbine and accessories

  • GE Frame 6 turbine clearance readings

    Positioning Turbine for clearance readings

  • Recording clearance data during GE Frame 6 turbine overhaul

    Recording clearance data

  • Inspection of GE Frame 6 turbine components

    Inspection of turbine components

  • Inspection of GE Frame 6 turbine components

    Inspection of turbine components

  • Cleaning of GE Frame 6B Turbine components

    Cleaning of turbine components

  • GE Frame 6B turbine alignment

    Turbine Shaft alignment check

  • Mark VI Distribution control system inspection

    Mark VI Distribution Control System Inspection

SCOPE OF REPAIR

Goltens dispatched a team of Mechanical, Electrical & Instrument and Turbine Control experts to Bangladesh to carry out the scope of work assisted by local mechanics, riggers and fitters. Scope included:

  • Preparation of special tools and replacement spare parts
  • Inspection/ Overhaul:
    • Gas turbine disassembly and rotor removal
    • Initial position and clearance measurements
    • Accessory, coupling, and inner turbine parts inspection and cleaning
    • Blade inspection and replacement
    • Mark VI Distribution Control System inspection
    • Alignment, Testing and Commissioning
  • Other Scope included:
    • Inspection of main gearbox
    • Cleaning and Inspection of Lube oil cooler
    • Inspect and cleaning Oil pumps
    • Cleaning fan motor set

THE RESULT

After reassembly, the Frame 6 Gas Turbine was successfully commissioned at 100% load test and rated for continuous operation at approximately 85% load. This was a major improvement in power generation capacity for the turbine which had been limited to a maximum of 70% load before the major overhaul.

Download a PDF of this Resource

(Right click and select "Save File As..." or "Save Link As..." to save)

Download Now
Dev Tool:

Request: resources/major-inspection-overhaul-for-gas-turbine-plant-in-bangladesh
Matched Rewrite Rule: resources/([^/]+)(?:/([0-9]+))?/?$
Matched Rewrite Query: resources=major-inspection-overhaul-for-gas-turbine-plant-in-bangladesh&page=
Loaded Template: single-resources.php
Search Goltens ×