Using Chockfast® Orange Resin To Resolve Foundation Corrosion At The Sportshub Stadium in Singapore.

Sportshub Stadium Roof – Singapore

During operations at one of the power stations of a major European electrical supplier, a lack of lubrication caused damage to one of the rotor shafts. The power station operators asked Goltens’ experienced In-situ engineers to evaluate the situation and determine the correct repair procedures.

The new stadium’s sliding rooftop’s 16 winches had alignment issues due to gaps caused by corrosion in the winch foundations.

As the authorized distributor and certified installation partner for ITW Polymer Technologies’ Chockfast® products , Goltens proposed a foundation chocking solution utilizing the Chockfast® Orange resin.

Goltens’ ITW certified engineers evaluated the requirements, calculated the grouting requirements and mobilized the required installation and safety equipment to completed the job high above the stadium floor.

  • Sportshub Stadium under construction in Singapore

    Sportshub Stadium under construction in Singapore

  • View of retractable roof guide rails

    View of retractable roof guide rails

  • Goltens Chockfast Orange application Sportshub Stadium Singapore

    Interior of Sportshub stadium under construction in Singapore

  • Goltens Chockfast Orange application Sportshub Stadium Singapore

    Sportshub retractable roof guide rails

  • Goltens filling gaps on the Sportshub winch footings with Chockfast Orange

    Filling gaps on the winch footings with Chockfast Orange

  • Goltens specialist performs final inspection of foundation

    Specialist performs final inspection of foundation

PROJECT FACTS

SPORTSHUB STADIUM
Customer: Draggages Singapore Pte Ltd
Project: Rooftop Towing Winch Foundations
Application date: April 2014
Substrate: Carbon Steel
Products: Chockfast Orange® PR 610 TCF

CHOCKFAST® ORANGE PROJECT SCOPE:

  • Inspection of the damaged shaft
  • Installation of machining tools and equipment
  • Machining of rotor shaft-end to undersize -1.5 mm (528.5 mm)
  • Honing of rotor shaft-end to obtain final roughness of 0.2 Ra
  • Inspection of end result and checking of straightness and surface roughness

CHOCKFAST® ORANGE GROUTING RESULTS:

The application of the grouting completely resolved the corrosion and alignment issues with the rooftop winches in a single installation process.

The winch was aligned according to specifications and operationally tested without issues.

Download a PDF of this Resource

(Right click and select "Save File As..." or "Save Link As..." to save)

Download Now
Dev Tool:

Request: resources/using-chockfast-orange-to-resolve-corrosion
Matched Rewrite Rule: resources/([^/]+)(?:/([0-9]+))?/?$
Matched Rewrite Query: resources=using-chockfast-orange-to-resolve-corrosion&page=
Loaded Template: single-resources.php
Search Goltens ×